Realisation

2012

Technical design of main pumping station and 6kV power substation in level of depth 865 m in Mysłowice-Wesoła Coal Mine

2011

Shipment, assembly and commisioning of 6 kV power switchgear based on 4 MultiCell-G bays located in mining gallery in Bolesław Mining and Metallurgical Company

2011

Upgrade of winding engine including replacement of 3 power switchgear bays & replacement of Control and Measurement Equipment and Automation switch boxes in Pokój Coal Mine - Lech II shaft

2011

Upgrade of power supply & control system of winding engine's main transverter's engine including replacement of switch box compatibile with 6kV 'RSD-12K' type power substation in Bolesław Śmiały Coal Mine - Aleksander III shaft

2010-2011

Comprehensive engineering design of 6kV 'RWT-5' power substation upgrade in Borynia Coal Mine - shaft No. I

2011

Comprehensive engineering design of 6kV 'RWT-2' power substation upgrade in Borynia Coal Mine - compressor house No. II

2010-2012

Service of low and medium voltage surface switchgear measurement in Sobieski Coal Mine

2012

Water gallery purification to ensure the main pumping station functionality at level of depth 1000 m in Bielszowice Coal Mine

2012

Two water gallerys purification from slime and mud at level of depth 642 m in Bielszowice Coal Mine

2009

Replacement of cable bearers mounted on the south side of shaft's wall. Shippment and assembly of trays & cable holders with the replacement of cable bearers mounted between shaft collar and level of depth 713 m in Borynia Coal Mine - shaft No. I

2010-2011

Shipment and assembly of hydromechanical water gallery purification equipment at the level of depth 665 m in Mysłowice-Wesoła Coal Mine

2008

Renovation of winding engine's supervision, drive control & breaking system in Bielszowice Coal Mine